Anchorage
Anchor pointsPass
Anchor accessoriesPass
Structure
Seam securityPass
StitchingPass
Blower tubePass
Walls and towersPass
Step / ramp sizePass
GroundingPass
Sharp anglesPass
PressurePass
Fall-off heightPass
Trough depthPass
EntrapmentPass
StabilityPass
Deflation / evacuationPass
Air lossPass
MarkingsPass
IdentificationPass
Materials
Fabric flame retardancyPass
Fabric strengthPass
ZipsPass
ThreadPass
RopesPass
NettingPass
WindowsPass
Artwork Pass
Totally enclosed details
ExitsPass
Exit markingsPass
Independent supportPass
Emergency lightingPass
Deflation of user areaPass
Slides
Height of wallsPass
Run-outPass
Clamber netPass
Slide sheetPass
Additional details
Anchor typePass
Number of anchorsPass
Open-side fall-off heightPass
Inside wall heightPass
Play areaPass
Max users by height
None recorded
Notes
To be used as a run through game , race your opponent .
Allow 20 second interval before next 2 race .
Risk assessment notes
Always anchor down every point
Avoid users climbing on walls .
Make sure joining strip between units are fitted .
Do not use in winds above 24 mph
Always supervise by a responsible adult .
Inspection. This inspection certifies that the equipment described above conforms to BS EN 14960. Where an item falls outside the scope of the standard, it has been manufactured and tested to that standard as closely as the design allows.
PASSED